Regulatory Due Diligence: How to Conduct a Site Visit and Inspection
Last month, we asked our audience: Which NERC standard requires disturbance and fault recording to support grid reliability? Overall, the most voted answer was PRC-002, with 83 percent of the vote. In second place, FAC-003 and BAL-002 tied with 8 percent each. Finally, MOD-025 received zero percent of the vote.
The correct answer is NERC standard PRC-002, which requires disturbance and fault recording to support grid reliability by mandating the installation and maintenance of disturbance monitoring equipment.
For more market research polls, visit: https://www.linkedin.com/company/certrec-corporation/
NERC – As regulatory expectations evolve, NERC audit readiness is crucial. Entities must stay vigilant to avoid costly penalties and maintain reliability. Download and read our comprehensive white paper to strengthen audit readiness, enhance internal controls, and align compliance programs with the latest NERC requirements.
Read More
NERC – NERC PRC-005 is a cornerstone standard for maintaining the reliability of the BES. By adhering to these rigorous standards, organizations can foster long-term grid stability and contribute to a sustainable energy future. Download and read our white paper to gain tips on PRC-005 compliance.
Read More
Newsletter Subscribers Can Use This Code to Save 10% on All Certrec CORE Packages
Don’t know what works for you? Arrange an introductory call for regulatory compliance today.
Click the button below (or call me, John, at 214-552-9589).
Subscribe to the Certrec Sentinel Newsletter here.