Regulatory Due Diligence: Advice to Reduce Regulatory Risks
Last month, we asked our audience: Which factor impacts wind farm curtailment the most? Overall, the most voted answer was Transmission Limits, with 57 percent of the vote. In second place, Turbine Height received 29 percent. In third place, Panel Tilt received 14 percent of the vote. Finally, Fuel Quality received zero percent of the vote.
The correct answer is Transmission Limits. Insufficient transmission capacity and local grid congestion are the primary factors driving wind farm curtailment, frequently forcing operators to reduce output when the transmission system cannot handle the electricity supply.
For more market research polls, visit: https://www.linkedin.com/company/certrec-corporation/
NERC – As regulatory expectations evolve, NERC audit readiness is crucial. Entities must stay vigilant to avoid costly penalties and maintain reliability. Download and read our comprehensive white paper to strengthen audit readiness, enhance internal controls, and align compliance programs with the latest NERC requirements.
Read More
NERC – NERC PRC-005 is a cornerstone standard for maintaining the reliability of the BES. By adhering to these rigorous standards, organizations can foster long-term grid stability and contribute to a sustainable energy future. Download and read our white paper to gain tips on PRC-005 compliance.
Read More
Newsletter Subscribers Can Use This Code to Save 10% on All Certrec CORE Packages
Don’t know what works for you? Arrange an introductory call for regulatory compliance today.
Click the button below (or call me, John, at 214-552-9589).
Subscribe to the Certrec Sentinel Newsletter
Email Version | LinkedIn Version