...
Inverter-based Resources

Solutions for NERC Inverter-Based Resources

We are ready to guide you through NERC's recent threshold change

Certrec has helped

generating facilities with NERC compliance, and we manage the entire NERC compliance program for
0 +
registered sites in the US, Canada, and Mexico.
0 +

Program Management

NERC compliance is complex. Gain access to our subject matter experts on demand.

Audit Support

We offer a multitude of options to support your entity in planning for your next audit.

NERC CIP

Cyberattacks are on the rise and the power grid and utilities are attractive targets.

Inverter-based Resources

Are You New to NERC?​

Significant changes are coming that will force many owners of Inverter-Based Resources (IBRs) to register with NERC for the first time. Certrec can help guide you through this difficult process.

The process of registering with NERC for the first time can be difficult. Utilities are not only responsible for understanding the current standards and meeting them, but they must also be prepared to have proof and documentation of compliance with the standards to be adequately prepared for NERC audits. Failure to do so can result in severe penalties that damage the business and create a plethora of additional work in response to any penalty.

Inverter-based Resources

NERC's Recent Threshold Change

The North American Electric Reliability Corporation’s (NERC) Reliability Standards define the requirements for the planning process and operations of the Bulk Electric System (BES). Recently NERC has proposed criteria to register some non-BES IBRs that are still connected to the bulk power system. The specific proposed revisions would require registration for:

  • Generator Owners – Inverter-Based Resources (GO-IBRs): Entities that own non-BES IBRs greater than or equal to 20 MVA at a common point of connection greater than or equal to 60 kV.
  • Generator Operators – Inverter-Based Resources (GOP-IBRs): Entities that operate non-BES IBRs greater than or equal to 20 MVA at a common point of connection greater than or equal to 60 kV.
Inverter-based Resources

How Certrec Can Help

Certrec has helped more than 120 generating facilities establish and maintain NERC compliance programs. We manage the entire NERC compliance program for 60+ registered entities in the US and Canada that trust us to decrease their regulatory and reputational risk.

Certrec can provide:

  • Program Development
    • Internal Compliance Program Development
    • Critical Infrastructure Program Low-Impact Development
    • FAC-008 Program Development
    • PRC-005 Program Development
  • Program Management
  • Commissioning Documentation
  • Audit Support
White Paper

Certrec's NERC Regulatory Compliance Support Services for Inverter-Based Resources

Navigate the Complexities of NERC Regulatory Compliance for Inverter-Based Resources with Certrec’s Expert Support: A comprehensive solution that addresses the unique challenges and evolving standards in the energy industry.

Need Help?

Speak with Our Experts

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.